ALDOT Road Closures and Advisores http://alitsweb.dot.state.al.us/RoadConditions/ Road Closures and Advisories issued by the Alabama Department of Transportation 2 I-20 Eastbound in Talladega County Division Wide Crew will be repairing guardrail in this area. Please use caution in this area. http://alitsweb.dot.state.al.us/RoadConditions/ 5/23/2013 9:44:45 AM I-59 Northbound in Tuscaloosa County Monday, May 20, 2013 through Friday, May 24, 2013, ALDOT will be performing routine maintenance on I-20/59 Northbound between MP 76 and MP 81. Work will require lane closures and will begin at 8:30 a.m. and will conclude at approximately 4:00 p.m. daily. No lane clousres will be in effect after noon on Friday, May 24th. Stationary and slow-moving vehicles will be present in this work zone. Motorists should be alert to signs, message boards, and personnel on the ground. Please use caution while traveling this section of highway. Expect delays of approximately 15 to 30 minutes. http://alitsweb.dot.state.al.us/RoadConditions/ 5/23/2013 9:06:12 AM SR 39 All in Greene County Roadway cleared. Traffic returned to normal. http://alitsweb.dot.state.al.us/RoadConditions/ 5/23/2013 8:54:28 AM US 84 All in Houston County US 84 (Main Street) in downtown Dothan is closed between North Oates Street and Museum Avenue for utility construction. Traffic will be re-routed from a four lane pattern to two lanes - one in each direction. Work is expected to be complete b 5 pm Wednesday, May 22. Motorists should use extreme caution in the area or seek an alternate route. http://alitsweb.dot.state.al.us/RoadConditions/ 5/22/2013 8:20:35 AM SR 67 All in Blount County AL 67 from US 231 (MP 0.00) in Blount County to the intersection with AL 69 (MP 8.79) in Cullman County will be closed to through traffic for culvert replacement by contractor. Once the culvert is replaced, AL 67 will reopen and remain open while the new bridge is under construction. Tentative date for closure to begin is June 4, 2013. The closure is estimated to last approximately 6 weeks once work begins. http://alitsweb.dot.state.al.us/RoadConditions/ 5/22/2013 7:16:07 AM I-20 All in Cleburne County Single lane closures in both directions from 8 p.m.- 8 a.m. until May 22, weather permitting. http://alitsweb.dot.state.al.us/RoadConditions/ 5/20/2013 5:32:34 PM SR 35 All in Jackson County Weather permitting, work is expected to begin Tuesday April 2nd 2013 to stabilize and repair a mountain side slope and asphalt failure between MM 43.00 and MM 44.00. Work will take place during daylight hours only, Monday thru Saturday and is epected to continue for approximately four weeks.During working hours traffic will be reduced to one lane in each direction. During non-working hours and at night all lanes will be open. Motorists are advised to use extreme caution when traveling this section of roadway. http://alitsweb.dot.state.al.us/RoadConditions/ 5/20/2013 8:06:39 AM SR 6 All in Pickens County The Paving operation has been completed, however construction work continues in the area(MP 19.2 to MP 22.0) in Pickens County. Motorists should be alert to signs, message boards, and workers. Use caution when traveling this section of highway. http://alitsweb.dot.state.al.us/RoadConditions/ 5/18/2013 8:07:29 AM US 280 All in Jefferson and Shelby Counties Milling and temporarily re-striping for lane shifts, excavating, relocating drainage and resurfacing the roadway http://alitsweb.dot.state.al.us/RoadConditions/ 5/17/2013 7:13:37 PM I-459 All in Jefferson County Guardrail Repairs http://alitsweb.dot.state.al.us/RoadConditions/ 5/17/2013 7:01:33 PM I-459 Northbound in Jefferson County Planned Lane Closures on I-459 SB and NB to Perform Asphalt Paving, in Jefferson County http://alitsweb.dot.state.al.us/RoadConditions/ 5/17/2013 6:46:23 PM I-459 Southbound in Jefferson County Planned Lane Closures on I-459 SB and NB to Perform Asphalt Paving, in Jefferson County http://alitsweb.dot.state.al.us/RoadConditions/ 5/17/2013 6:43:18 PM SR 75 All in Jefferson County Sunday, May 19 @7 p.m. until Monday, May 20 @6 a.m., at various times the NB & SB inside and outside lanes of State Road 75 from Huffman Road (milepost 1.93) to Fox Hill Drive (milepost 4.93) will be closed. The same procedure will be followed the following four nights. http://alitsweb.dot.state.al.us/RoadConditions/ 5/17/2013 6:35:03 PM SR 119 All in Shelby County Monday, May 20 @7 p.m. until Tuesday, May 21 @6 a.m., at various times the northbound and southbound inside and outside lanes of State Road 119 from 0.5 mile north of the I-65 Interchange (milepost 19.5) to US 280 (milepost 28.0) will be closed to perform asphalt paving operations at this location. The same procedure will be followed the following three nights. http://alitsweb.dot.state.al.us/RoadConditions/ 5/17/2013 6:31:42 PM US 84 Westbound in Choctaw County Traffic is running on one lane , due to land slide. http://alitsweb.dot.state.al.us/RoadConditions/ 5/16/2013 2:25:56 PM SR 59 Northbound in Baldwin County DUE TO BRIDGE INSPECTION http://alitsweb.dot.state.al.us/RoadConditions/ 5/16/2013 7:48:26 AM US 84 All in Houston County Utility work has been postponed to a future date. http://alitsweb.dot.state.al.us/RoadConditions/ 5/16/2013 7:11:18 AM SR 5 Northbound in Perry County ALDOT will be repairing a cross drain pipe at this location. Northbound lane will remain closed and traffic will be directed through Southbound lane. Minimum delays can be expected. Travel with caution. http://alitsweb.dot.state.al.us/RoadConditions/ 5/15/2013 8:14:48 AM I-459 Northbound in Jefferson County This inspection will require the outside (right) lane and shoulder to be closed in the area of the work. Following completion of the northbound lane closure, work will continue on the I-459 northbound ramp to US-11. All travel lanes will be reopened to traffic no later than 3:30 p.m. http://alitsweb.dot.state.al.us/RoadConditions/ 5/13/2013 7:01:57 PM I-459 All in Jefferson County This inspection will require the outside (right) lane and shoulder to be closed in the area of the work. Following completion of the northbound lane closure, work will continue in the southbound direction. All travel lanes will be reopened to traffic no later than 3:00 p.m. http://alitsweb.dot.state.al.us/RoadConditions/ 5/13/2013 6:58:49 PM I-459 Southbound in Jefferson County • Sunday, May 12 at 7 p.m. until Monday, May 13 at 6 a.m., the southbound outside lane of I-459 from the Grants Mill Road Interchange (milepost 27.0) to south of the US 280 Interchange (milepost 20.0) will be closed to perform asphalt paving operations at this location. • Also, beginning Sunday night, May 12 at 10 p.m. until Monday May 13 at 6 a.m. the adjacent outside lane will be closed at the same above location. The same procedure will be followed the following four nights. http://alitsweb.dot.state.al.us/RoadConditions/ 5/13/2013 2:04:21 PM US 431 All in Madison County US-431 Northbound will be reopened to 2 lanes on May 9. Temporary lane closures will be utilized between 9:00am and 4:00pm to complete median work. Dug Hill Road will be closed between US-431 and Legacy Preserve Drive May 9 - August 24. Detours will be in place for local traffic only. http://alitsweb.dot.state.al.us/RoadConditions/ 5/10/2013 8:56:29 PM SR 119 All in Shelby County • Sunday, May 12, at 7 p.m. until Monday, May 13 at 6 a.m., at various times the northbound and southbound inside and outside lanes of State Road 119 from 0.5 mile north of the I-65 Interchange (milepost 19.5) to US 280 (milepost 28.0) will be closed to perform asphalt paving operations at this location. The same procedure will be followed the following five nights. http://alitsweb.dot.state.al.us/RoadConditions/ 5/10/2013 12:07:55 PM SR 119 Northbound in Shelby County • Sunday, May 12 at 7 p.m. until Monday, May 13 at 6 a.m., the northbound lane of State Route 119 from (milepost 0.04) to (milepost 1.0) will be closed to perform sidewalk replacement operations at this location. The same procedure will be followed the following four nights. http://alitsweb.dot.state.al.us/RoadConditions/ 5/10/2013 12:06:17 PM SR 4 All in St. Clair County Road will be closed between mile markers 125-126 beginning Tuesday, April 30 to replace the bridge at Cane Creek. It is expected to remain closed for approximately six months. Traffic will be detoured onto I-20 using Exit 147 (Brompton), Exit 152 (Cook Springs) and Exit 153 (Chula Vista). http://alitsweb.dot.state.al.us/RoadConditions/ 4/29/2013 3:02:17 PM I-85 All in Montgomery County Construction of new interchange, adding a loop ramp and widenening bridges. Reduced speed limits and lane closures/shifts during the project. http://alitsweb.dot.state.al.us/RoadConditions/ 4/17/2013 3:18:33 PM I-65 Northbound in Shelby County Bridge widening and paving operations-This ramp closure is expected to remain in effect for 6 – 8 weeks. http://alitsweb.dot.state.al.us/RoadConditions/ 4/17/2013 3:03:48 PM I-20 All in Jefferson County Once the eastbound lanes are completed, the westbound lanes will close and a detour route will be used. A $30,000 per day incentive/disincentive is included in the contract with the bonus to the contractor calculated upon completion. Plans are to do asphalt patching repairs on both eastbound and westbound lanes of I-20, which will involve having various lane closures from the I-20/ I-459 Interchange to the 1st Leeds Exit (Bass Pro Shop). Following the patching of both the eastbound and westbound lanes, they will be milled for slope correction and paved with asphalt binder, asphalt wearing surface and will then be restriped. http://alitsweb.dot.state.al.us/RoadConditions/ 4/2/2013 6:50:38 PM SR 123 All in Dale County Due to a construction project this section of AL 123 will be closed until roadwork is complete. http://alitsweb.dot.state.al.us/RoadConditions/ 2/26/2013 8:51:12 AM US 84 All in Covington County Beginning January 28, 2013, construction of a new bridge on the eastbound roadway of US 84 over Yellow River near Babbie (MP 141.5) will necessitate the closure of the eastbound bridge with traffic diverted from a 4 lane pattern to a 2 way pattern across the westbound bridge. Loads will be restricted to a maximum of 12 feet. Construction is expected to continue through Winter 2013. http://alitsweb.dot.state.al.us/RoadConditions/ 1/28/2013 11:08:26 AM SR 77 All in Etowah County Additional lane construction project on SR 77. Work is continuing. Motorists should use caution through the work zone. http://alitsweb.dot.state.al.us/RoadConditions/ 1/9/2013 9:28:27 AM US 231 All in Elmore and Montgomery Counties Construct an additional lane and relief bridge on US231 North between the Tallapoosa River Bridge and Redland Road. Expected traffic impact will be a northbound, two-lane traffic shift over to the southbound relief bridge and intermittent lane closures. http://alitsweb.dot.state.al.us/RoadConditions/ 9/11/2012 12:49:20 PM I-20 Eastbound in Calhoun County Grading, drainage, and paving in the median between mile markers 185.8 and 193. Currently, eastbound traffic is shifted to the outside shoulder in this work area. http://alitsweb.dot.state.al.us/RoadConditions/ 8/27/2012 5:21:32 PM I-20 Westbound in Cleburne County Length: 1.859 miles Construction Began: December 2011 Estimated Project Completion: Fall 2013 http://alitsweb.dot.state.al.us/RoadConditions/ 4/3/2012 4:44:00 PM