Roadwork
Location:
I-20 Eastbound and Westbound Lanes in Jefferson County
Weather permitting, on Monday, February 11, beginning at 9 a.m., Norfolk Southern Railroad will be repairing their tracks over I-20, between the US 78 Interchange (exit 140) and the Dawson Street overpass, in Leeds as follows:
Details:
This work will require the I-20 eastbound inside (left) lane and shoulder and the I-20 westbound inside (left) lane and shoulder to be closed at the Railroad Overpass, from 9 a.m. until 3 p.m.
The remaining two lanes in each direction of travel will remain open to traffic during this operation.
Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area. ALDOT thanks motorists for their patience during this Maintenance Operation.
Planned Lane Closures for Norfolk Southern Railroad to Perform Track Maintenance over I-20, in Leeds
Status:
Advisory
Last Update:
02/08/2013 05:34 PM